Length X width X depth will give you the volume of the whole area. If you use feet, divide by 27 to convert to cubic yards. To find the volume of the sloped area use the formula: the square of c = the square of a + the square of b (where c is the length of the slope, a is the depth.

Accordingly, how do you calculate excavation volume?

Simply multiply the length by the width by the depth or use our simple volume calculator. Circular areas are also easy to calculate. Simply multiply 3.1415 (π) by the radius, by the radius again, by the depth or use our simple volume calculator.

Beside above, what is sloping in excavation? This appendix contains specifications for sloping and benching when used as methods of protecting employees working in excavations from cave-ins. Actual slope means the slope to which an excavation face is excavated. Distress means that the soil is in a condition where a cave-in is imminent or is likely to occur.

Accordingly, how do you calculate fill dirt on a slope?

Calculate the volume (in Cubic Feet – L x W x D) of the area for which you need fill material. If the material is ordered by the yard, divide the CF by 27. If the material is ordered by the ton, identify the weight per CF of the material and multiply it out. Next, divide by 2000 to convert the weight to tons.

How do I find the volume?

Units of Measure

  1. Volume = length x width x height.
  2. You only need to know one side to figure out the volume of a cube.
  3. The units of measure for volume are cubic units.
  4. Volume is in three-dimensions.
  5. You can multiply the sides in any order.
  6. Which side you call length, width, or height doesn't matter.

Related Question Answers

How do you determine the slope?

Using the Slope Equation
  1. Pick two points on the line and determine their coordinates.
  2. Determine the difference in y-coordinates of these two points (rise).
  3. Determine the difference in x-coordinates for these two points (run).
  4. Divide the difference in y-coordinates by the difference in x-coordinates (rise/run or slope).

How many degrees is a 2 to 1 slope?

Table of Common Slopes
DegreesGradientPercent
26.57°1 : 250%
30°1 : 1.7357.7%
45°1 : 1100%
56.31°1: 0.67150%

How do you find the volume of a trench?

Determine the volume of the trench by using the formula: Volume = Width x Length x Depth. As an example, a trench 12 feet long with an average width of 2.3 feet and an average depth of 5 feet has a volume of (12 x 2.3 x 5) cubic feet.

How do you measure the depth of water?

Depth finder, also called echo sounder, device used on ships to determine the depth of water by measuring the time it takes a sound (sonic pulse) produced just below the water surface to return, or echo, from the bottom of the body of water.

What is the standard ratio of excavated soil to depth of excavation?

A. Sloping
Soil typeHeight:Depth ratioSlope angle
Type B1:145°
Type C1½:134°
Type A(short-term)½:163°
(For a maximum excavation depth of 12 ft)

What is bulk factor?

Bulk Factor

The ratio of the density of a material after molding to the density of the raw material. Provides a measure of the volume change that can be expected during processing.

How do you measure sand?

How much sand do I need?
  1. Determine the length and width of the cuboidal excavation.
  2. Calculate the area of the excavation by multiplying the length by the width.
  3. Establish the depth of the excavation.
  4. Multiply the area by the depth of the excavation to obtain its volume: 36 * 0.5 = 18 cu yd .

How do you calculate the volume of a skip?

If we have the dimensions of a skip in feet, we can calculate the number of cubic yards of debris the skip can hold with this formula:
  1. Multiply length X width X height in feet to get total cubic feet.
  2. Divide total cubic feet by 27 to get number of cubic yards.

How do you calculate excavation cost?

On average, you'll end up paying between $1,500 to $6,000. Just digging the hole for a new basement or crawlspace can cost between $500 for a DIY job – just renting the equipment for a small project. For larger projects, expect to pay upwards of $6,000 to $10,000.

How do you measure mulch?

Calculating Cubic Yards
  1. Measure the length and width of the area in feet.
  2. Determine how deeply you want to layer your mulch.
  3. Multiply your total area in feet by how deep you want your mulch in inches.
  4. Divide your answer by 324 (1 cubic yard of mulch will cover 324 square feet 1 inch deep).

What is bulk excavation in construction?

Bulk earthworks in construction includes the removal, moving or adding of large quantities of soil and/or rock from a particular area to another to create a suitable area for construction.

How do you calculate bulk factor?

Bulk factor is the ratio of the volume of any given quantity of the loose plastic material to the volume of the same quantity of the material after molding or forming. The bulk factor is also equal to the ratio of the density after molding or forming to the apparent density of the material as received.

How much does fill dirt cost?

Topsoil costs $12 to $55 per cubic yard. Fill dirt ranges from $7 to $12 per cubic yard. Sand typically falls between $15 and $40 per cubic yard.

How much dirt does it take to raise 1 acre of 1 foot?

Hi Debbie, According to Wikipedia, acre is 43,560 square feet. So, if you dig 1 foot deep over an acre, you get 43,560 cubic feet of dirt.

How many cubic yards are in a dump truck?

10

What are the three methods of excavation?

There are number of excavation methods which are used for deep foundation construction such as full open cut method, bracing excavation, anchored excavation, island excavation methods,zoned excavation, top down construction methods etc. These excavation techniques are discussed.

What are the two types of excavation?

Different Types of Excavation
  • Channel. Channel excavation comprises removing materials from drainage ditches and channels, usually to alter water flow or to increase capacity.
  • Bridge.
  • Drainage/Structure.
  • Borrow.
  • Earth.
  • Dredging.
  • Muck.
  • Footing.

What is a 100% slope?

A 100% slope is a 45° slope (try with the just explained method!). WARNING: Gradeability for vehicles is measured in percentage, and it differs from the slope in degrees, for example, a 100% slope is a 45 degrees slope. The slope in percent and the slope in degrees are DIFFERENT.