Your specifications (or specs) are a written document that details what materials will be used and how to install things. So, if the plan illustrates one sink in the master bathroom, the plumbing subcontractor turns to the specs to find out exactly which sink you want installed.
What are speech tags used for in dialogue? speech tags examples.

Contents

What are plans and specs?

Plan and spec is a method of commercial construction project delivery where design drawings (or plans) are created along with written specifications (or specs) to further describe the equipment and parts shown in the drawings. … Before a construction project begins, the Owner must decide on the project delivery approach.

What is a spec sheet for building a house?

The specification sheet lists the materials that will be used, therefore giving all involved a better idea of how the finished home will look.

What are building specs?

Building Specifications (also called “specs”) are used by subcontractors and teams as a guide to choosing the right materials for the specialized project. Their overall purpose is to define the requirements for project execution regarding installation, materials, products, procedures, and quality aspects.

Do specs override Drawings?

If there is a conflict between the Drawings and Details on Drawings and the Specifications, then the Specifications will prevail. The higher “Order of Precedence of Documents” governs or prevails.

Which details are shown in specifications?

Specifications contains the written instructions for constructing highway projects, outlining in detail a description of the work, materials, construction methods, method of measurement, basis of payment, and the pay item for each item of work involved in the contract.

What are specs in new construction?

A spec home is a new, move-in-ready home built by home builders across the country. These are houses that are built before a home buyer makes a purchase. Homebuilders offer spec homes because not every homebuyer has five to six months to wait for their new dream home to be built.

How do I write a builder spec?

  1. Create a clear definition. …
  2. Detail to support drawings. …
  3. Information to ensure accurate pricing. …
  4. Minimise risk. …
  5. Focus on compliance. …
  6. Give clear instructions. …
  7. Make it legally binding. …
  8. Ensure client satisfaction.
How do you outline a specification?

Based on definitions from the AIA Handbook and the CSI Manual of Practice, an outline specification is an itemized list, using brief, concise statements, of significant materials, systems, and equipment and their criteria and levels of quality. In Addition, any criteria having a special cost impact would be indicated.

What are the four types of specifications?

Deciding among the four types of specifications—descriptive, performance, reference standard, and proprietary—and choosing how the specification is going to be written is only the first of many design decisions engineers make when starting to edit what will become a project specification, especially when specifying …

What are the three types of specifications?

In every construction project, there are three types of construction specifications. The three types of construction specifications are prescriptive, performance, and proprietary.

What are 5 methods of specification?

  • Requirement Specifications. Documentation of a business need. …
  • Design Specifications. …
  • Material Specifications. …
  • Standard Specifications. …
  • Interface Specifications. …
  • Test Specifications. …
  • Performance Specifications. …
  • Quality Specifications.
What is the difference between specifications and construction drawings?

Your house plans are a set of scaled drawings that show contractors what they are building. Your specifications (or specs) are a written document that details what materials will be used and how to install things.

What is the difference between a drawing and a specification?

Specifications will detail the materials, standards, techniques, and so on required to carry out the works. Construction drawings provide the graphical representation, indicating the arrangement of components, detailing, dimensions, and so on.

What is limit of retention in construction?

What is the ‘Limit of Retention Money? Retention sum is subjected to limit as per the stated percentage in the contract which is known as ‘Limit of Retention’. In general, ‘Limit of Retention’ is 5% of the contract sum. Therefore once the Limit of Retention is reached, you cannot deduct further Retention Money.

What is a full specification?

Also known as a full specification, it essentially identifies each and every item, right down to the spacing and number of screws required to fix plasterboard for example, as well as the size, type and material of the screw. This gives the client more certainty when the work is tendered and priced by the contractor.

What are specs on PC?

  • Processor speed, model and manufacturer. …
  • Random Access Memory (RAM), This is typically indicated in gigabytes (GB). …
  • Hard disk (sometimes called ROM) space. …
  • Other specifications might include network (ethernet or wi-fi) adapters or audio and video capabilities.
What are the 2 types of specifications?

  • General Specifications.
  • Detailed Specifications.
How does buying a spec house work?

Spec homes are completed or nearly completed before they’re sold. The builder has already chosen the floor plan, appliances, and features, so a buyer has limited choices are limited in regards to things like paint colors and flooring.

What is the difference between a spec home and a model home?

When it comes to builders, spec home vs model home builders will often include nice materials that custom home builders sometimes consider upgrades and that model homes don’t typically offer. The number of spec homes usually being built means that you’ll often have your choice of location.

What are 4 main functions of the plans and specifications?

  • clearly and concisely.
  • neatly and legibly.
  • in a logical sequence.
  • with consistency between drawings and specifications.
  • with the drawings of different consultants coordinated to prevent conflicts, ambiguity or contradictions.
  • with all dimensions shown and drawn to scale.
What should not be written in a construction specifications?

Specifications should avoid the use of ambiguous words that could lead to misinterpretation. Specifications should be written using simple words in short, easy-to-understand sentences. Specifications should use technically correct terms, and avoid slang or “field” words.

What are short form specs?

Spectacles; eyeglasses. … (colloquial, plural only) Abbreviation of spectacles.

What are short form specifications?

In the military, spec is a standard abbreviation for specification. I believe that the technical community will most likely see this abbreviation as meaning specification.

What is a performance specification?

A performance specification defines the functional requirements for the item, the environment in which it must operate, and interface and interchangeability characteristics.

What is the example of specification?

The definition of a specification is a precise requirement, or a detailed description of workmanship, materials or processes. A mandate that only domestic plywood be used in the construction of your home is an example of a specification.

What is a sample specification?

This is another term for proof sample. A proof sample allows a customer to see an actual sample of what the finished, customized product looks like before placing an order.

What are specifications used for?

The specification provides clear instructions on project intent, performance and construction. It can reference the quality and standards which should be applied. Materials and manufacturers’ products can be clearly defined.

What are material specifications?

Material Specifications means the description of the Material, including requirements, tolerances, shelf life, specifications, suppliers and safety data, that are set forth in Exhibit D.

How do you write a performance specification?

  1. describe the specific things you want the outcome of your design to achieve.
  2. give some indication of what the product should look like (not necessarily a drawing but a statement like “must be bright and appeal to young children”)
What are prescriptive specifications?

prescriptive specification. Specifications that describe not only the expected end result of construction, but also methods and materials that must be used to achieve the desired results. Also called proprietary specifications.

What are the various specifications?

  • Product Specification: This describes a manufacturer’s product and its performance without consideration for a particular building. …
  • Project Specification: This describes an architect’s design and performance requirements for a particular building. …
  • Master Specification: …
  • Guide Specification:
What are the various types of specifications?

  • General Specifications. General Specifications are also known as Brief Specifications. …
  • Detailed Specifications. Detailed Specifications shows, in the detailed description, characteristics, quantity, ratio and formation method of the material used in construction work.
What are proprietary specifications?

In general, proprietary specifications are descriptions of materials that either cite a specific brand name or are written so restrictively that only one vendor or manufacturer can supply the desired items.

What drawings are needed to build a house?

  • Plans. Plans are diagrams drawn to scale, showing the arrangement of columns, beams, and ceilings inside a building. …
  • Interior and Exterior Elevations. …
  • Section Drawings. …
  • Interior & Exterior Detailing. …
  • Room Finishes and Schedules. …
  • Framing and Utility Plans.
What are specifications in drawings?

Working drawings and specifications are the primary working documents used by a contractor to bid and execute a project. Specifications are the written documents that go with the construction documents and describe the materials as well as the installation methods.

What are sheet specifications?

Simply stated, sheet specifications are project specifications that are formatted and placed on one or more drawing sheets. You may hear them referred to as “sheet specs” or “specs on drawings.”

What are the 6 types of construction drawings?

  • Plans.
  • Interior and exterior elevations.
  • Building and wall sections.
  • Interior and exterior details.
  • Schedules and room finishes.
  • Framing and utility plans.
What is the difference between notes and specifications?

By definition, drawing notes that describe materials, equipment, systems, standards, or workmanship are specifications. And, though far less common, graphic images that appear on small paper are drawings.

Do architects own their drawings?

Thus, while architects and engineers may own their original models, drawings, and specifications, they do not own their designs. Copyrights belong to the author of the work, except works “for hire,” created as part of the author’s employment.